Welcome to Strata Choice E-Newsletter
Welcome to the first edition of the Strata Choice quarterly E-Newsletter.
Our newsletters have traditionally been sent via post. This new E-Newsletter will provide the same informative strata topic articles as well as providing us with the flexibility to give you more relevant information as important news arises.
We hope you enjoy our E-Newsletter. Please feel free to forward this newsletter on to others. You can also write to us with comments and suggestions at info@stratachoice.com.au.
Home Building Legislation Amendments, what does it mean for you?
The New South Wales Government’s latest round of amendments to the Home Building Act 1989 has zeroed in on strata practices in building defects claims. Such claims are now more complicated and require specialist assistance more than ever.
This paper briefly comments on some aspects of the following;
Strata building defects claims are often pursued very slowly and not always in the right direction for reasons including:
The amendments, which are the first for this sector from the newly elected government, seem to have been rushed through parliament. One wonders whether it was intentional and how these amendments promote the advertised outcome of encouraging building in New South Wales, which partially depends upon consumer confidence in new units. The rights lost from 25 October 2011 are explained below.
“3B Date of completion of residential building work
1) The completion of residential building work occurs on the date that the work is complete within the meaning of the contract under which the work was done.
2) If the contract does not provide for when work is complete (or there is no contract), the completion of residential building work occurs on practical completion of the work, which is when the work is completed except for any omissions or defects that do not prevent the work from being reasonably capable of being used for its intended purpose.
3) It is to be presumed (unless an earlier date for practical completion can be established) that practical completion of residential building work occurred on the earliest of whichever of the following dates can be established for the work:
a) the date on which the contractor handed over possession of the work to the owner,
b) the date on which the contractor last attended the site to carry out work (other than work to remedy any defect that does not affect practical completion),
c) the date of issue of an occupation certificate under the Environmental Planning and Assessment Act 1979 that authorises commencement of the use or occupation of the work,
d) (in the case of owner-builder work) the date that is 18 months after the issue of the owner-builder permit for the work.
4) If residential building work comprises the construction of 2 or more buildings each of which is reasonably capable of being used and occupied separately, practical completion of the individual buildings can occur at different times (so that practical completion of any one building does not require practical completion of all the buildings).
5) This section applies for the purposes of determining when completion of residential building work occurs for the purposes of any provision of this Act, the regulations or a contract of home warranty insurance.
In respect of the rights taken away, the New South Wales Government has allowed two 6 month grace periods which traverse the Christmas Period. However, as mentioned above it has imposed significant over-arching obligations which will have a very significant impact on consumer rights in the years to come. These are explained below.
The term “diligently pursue” is not yet defined. However, the amendments contemplate that it will be defined at some time in the future.
Speculating, we anticipate that the diligent pursuit requirement will not be met where:
a) Action was not taken because the identity of the builder, developer or insurer was not known.
b) Motions, advice or investigations are deferred:
a. to protect relationships with the builder or developer; or
b. because the developer was still in control or influential at the time; or
c. to continue to allow the builder to pretend to offer to return to site to rectify over an unreasonable period of time; or
d. to appease individuals who:
i. do not want to spend the money; or
ii. are not affected personally;
c) Because the member of the scheme are too busy at this point in time to deal with the issues; or
d) Because the scheme does not know what to do.
Speculating again, we anticipate that the diligent pursuit requirement would be met where a scheme:
a) Promptly investigates, seeks advice and pursues defects as soon as they become apparent;
b) Actively pursues defect claims by commencing proceedings and efficiently putting on all of its evidence against builders and/or developers;
c) Complies with Tribunal or Court timetables where reasonably practicable;
d) Obtains evidence in reply and presses matters to settlement or hearing in a timely manner; and
e) Addresses any issues that arise during proceedings in a diligent and timely manner.
A huge concern for schemes created in the future, where the building contract was entered into after proclamation (anticipated 1 February 2012), is that the statutory warranty periods for claims against the builder, developer or sub-contractor will be reduced from 7 years for all defects to 2 years for non-structural defects and 6 years for structural defects. Where a defect becomes apparent in the last six months of the warranty period, then there will, for that defect only, be six months to commence from when the defect becomes apparent.
Having the building contract is critical for ascertaining whether the warranty period is 7 years from completion or 2 years for non-structural and 6 years for structural defects. This is ridiculous as it is very rare for schemes to have a copy of the contract and it is not specifically identified as a document the developer must provide at or before the first annual general meeting. Many schemes will be in a position where they will not know when “completion” was or how many years after “completion” they have to commence proceedings.
Many typical and important defects in future strata schemes will have 2 year warranties. They will include most of the usual fire safety defects prevalent in strata buildings due to poor certification practices and the limitations of annual fire safety statement inspections, despite the usual expectations of schemes that they have been properly investigated and reported on annually. Defective membranes in shower trays, another common problem will probably also have a 2 year warranty.
The convoluted and vague definition of “structural defect” from the Home Building Regulation 2004 is extracted below. We expect the courts will at some point clarify how it should be applied.
71 Meaning of “structural defect”
1) For the purposes of section 103B (2) of the Act, structural defect means any defect in a structural element of a building that is attributable to defective design, defective or faulty workmanship or defective materials (or any combination of these) and that:
a) results in, or is likely to result in, the building or any part of the building being required by or under any law to be closed or prohibited from being used, or
b) prevents, or is likely to prevent, the continued practical use of the building or any part of the building, or
c) results in, or is likely to result in:
i. the destruction of the building or any part of the building, or
ii. physical damage to the building or any part of the building, or
d) results in, or is likely to result in, a threat of imminent collapse that may reasonably be considered to cause destruction of the building or physical damage to the building or any part of the building.
2) In subclause (1): structural element of a building means:
a) any internal or external load-bearing component of the building that is essential to the stability of the building or any part of it, including things such as foundations, floors, walls, roofs, columns and beams, and
b) any component (including weatherproofing) that forms part of the external walls or roof of the building.
Schemes may need to become aware of and commence proceedings in relation to building defects within 2 years from completion. That may be difficult noting that 2 years from completion will almost always be less than, and sometimes much less than, 2 years from the date of strata plan registration.
In line with construction cost increases, the threshold for when home warranty insurance is required and where a cooling-off period applies will be increased from $12,000 to $20,000. There seems to be the possibility of optional insurance for works below $20,000.
There are less rigorous “short form” contract requirements for works between $1,000 and $5,000 which must:
For contracts of insurance entered into after proclamation (anticipated 1 February 2012):
As noted above, this area has now become vastly more complex. Schemes need to react quickly to the changing landscape.
The executive committee/owners corporation resolves to seek legal advice in relation to time limits, required steps and relevant parties for any building defects claims.
Note (not part of motion): The owners corporation has a mandatory obligation to repair and maintain the common property including building defects which can be varied by law. If building defects exist then another party may be held accountable to rectify or pay the loss, such as, builders, developers, certifiers, Home Warranty insurers, contractors, subcontractors, designers or engineers.
There are key dates and steps required to be undertaken in order to claim for the loss or rectification. Such time limits, without limitation, range from immediately to 45 days, 6 months, 12 months, 2 years, 6 years, 7 years and 10 years, starting from different points in time. Failure to comply with these time limits may result in denial of the claim or liability or reduction in the amount otherwise ordinarily recoverable.
It is not part of the strata managing agent’s agreement with the scheme to provide legal advice on building defects nor is it sufficiently qualified to do so.
David Bannerman and Banjo Stanton
Bannermans Lawyers
Strata Choice - Gold Sponsor at Griffith University Conference
Strata Choice was proud to once again support the Griffith University Strata & Community Title in Australia 2011 Conference as a Gold Sponsor. The conference was held on Queensland’s Gold Coast between 7 to 9 September 2011.
The conference, run every two years by the Griffith Business School, is the only one of its type that includes university grade attendance and content. The attendees included practicing representatives of strata & community stakeholders such as government, owners, committees, architects, planners, lawyers, developers, accountants, strata and community managers, building managers, insurers, suppliers, contractors and many others.
Strata Choice presented in two sessions of the conference. Licensee in Charge and Director of Strata Choice CBD, Patrick Saad, discussed on a panel session how to build a better partnership between the executive committee and the strata manager. A topic which Strata Choice has a passion to achieve with its clients. Carole Hardin, Senior Strata Manager, presented on managing complex design strata schemes, in particular the Strata Choice managed King Street Wharf precinct in Sydney. Carole discussed how complex entity structures co-exist and the challenges stakeholders face in maintenance, finance and community.
For further information on the conference please visit here – http://www.griffith.edu.au/conference/strata-community-title-australia-21st-century-iv
![]()
Whilst digital television has been broadcast in parts of Australia for a decade, the major switchover from analogue to digital television began in early 2010. It is expected that the switchover from analogue to digital will be completed by 2013.
The Government is switching to digital to keep pace with broadcast standards overseas, and to free up broadcast space for other community services. If you have not already experienced digital television, it provides DVD quality picture and CD quality sound in a widescreen format. It also enables an interactive TV guide to be displayed on-screen. All broadcasters have introduced additional channels as a result of the move to digital television.
Many existing antennas in the home will be able to receive digital transmissions without any problem. However, in some cases, equipment may need to be upgraded to receive reliable digital signals. Your building’s antenna may also need to be assessed by an antenna installer to find out if it needs to be replaced.
Apartments and units, groups of townhouses, retirement villages and public and commercial facilities often use a shared antenna system, commonly known as a master antenna TV (MATV). This shared system may need to be upgraded, or the Owners Corporation may have to install one for the first time. If your shared antenna system is receiving digital TV and distributing it via cable throughout your building, you do not need to do anything further.
Residents just have to make sure that they have the correct equipment, such as a set top box, a digital recorder or a TV with an in-built digital tuner.
For more information on digital television and the switchover process, go to www.digitalready.gov.au/.
Disclaimer: The information enclosed is general in nature and cannot be relied upon as legal advice. Strata Choice Pty Ltd and its associated companies disclaim any liability (including for negligence) to any person in respect of: anything and the consequences of anything, done or not done, by any such person in whole or partial reliance upon the whole or part of the information enclosed. © Strata Choice 2012.